One of the essential aspects of garment industry is efficiency. It impacts on production volumes, manufacturing costs, product quality and on-time delivery. Garment factories need to utilize their labour resources, machines and days to be competitive.
Efficiency – it’s not just about asking operators to work faster. It will need good planning, leadership, work balances, operators, and an ongoing improvement process.
Industrial engineering (IE) is an important area for identifying losses in the production, elimination of unnecessary actions and enhancing the sewing-line performance.
Read article: what is Insudrial Enigneering?
Let’s see how to achieve more efficiency in the garment industry through these 10 simple ways.
1. Ensure Good Leadership
The production target can only be achieved by good leadership. It is necessary for the coordination between supervisors, production managers and IE teams in order to keep the production process going well.
For strong leadership, it is important to set goals that are attainable, check out the production hours and fix the problems happening on-site, and communicate properly with operators.
If the sewing line doesn’t meet the target for an hour, for instance, the supervisor should find out the actual cause. When it comes to the question, the reason could be anything as unbalanced lines, machine failure, insufficient supplies, or inept operator skills.
Rather than blaming the workers, effective leaders find out the root causes of poor productivity and resolve them.
2. Introduce Automation
In appropriate operations, automation may help to boost production rates, enhance uniformity, and decrease manual labour.
The following are some examples of automation in the garment industry:
- Automatic sewing thread trimming machines are using.
- Automatic pocket-setting machines.
- Automatic buttonhole & button-sewing machines.
- Programmable pattern-sewing machines.
- Use update machineries in garment industry
- Fabric spreading and slicing machines with an automatic function.

When considering investing in automation, factories should be able to assess the current duration for the operation, expected productivity gain, positive quality impact and the investment worth.
The goal is to choose technology that will deliver measurable benefits and not automation for the sake of automation.
3. Make sure to balance the lines properly.
One of the most crucial roles of the Industrial Engineering department is line balancing. It encompasses how to allocate workloads between operators based on time required for an operation, production goals, availability of machines and the skills of the operators.
If the lines are not balanced, it is likely to cause a bottleneck, too much work in progress (WIP), and idle time.
For instance, if most of the operations can perform 100 pieces an hour, but the critical one can perform only 60 pieces an hour, then the critical operation could be holding the line back.
The IE team needs to analyze operation SMVs to identify the bottlenecks, redistribute workloads and offer extra support when needed.
Read article: How to calculate SMV?
A well-balanced line ensures uninterrupted flow of production and better utilization of manpower.
4. Minimize Layout and Changeover Times
The amount of time available for product is lost due to unplanned layout changes and long style changeovers.
A new style introduces the need for factory to rearrange machines, replace attachments, modify machine settings and training operators. The production can be delayed if the matter wasn’t prepared properly.
- To minimize change over time the IE and production teams should:
- Create the layout for the new line beforehand.
- Set up machines and attachments prior to changeover.
- Provide training for operators of new operations.
- Perform maintenance task(s) in advance.
- Use a standard Changeover Checklist.
Preparation that is exacerbated by downtime can be reduced, so that the production starts earlier.
5. Improve Layout to Reduce SMV
Information on how workstation positioning can minimize repetitive movements and ease activities.
Operators often waste time chasing materials, looking for tools, locating garments in their pouch or moving bundles over “unnecessary distances”. All these little losses can add up over the course of the working day.
With a well planned work stations and with a simple furniture smartening up, such as having materials within easy reach, a workstation with machines following the manufacturing order, and appropriate folders + attachments, the factory is able to significantly optimize work station layouts.
One such example, for instance, is garment bundles and completed clothing closer to an operator actually results in handling time reduction.
A change in layout will not automatically decrease SMV, though. Before a revised standard time is established an operation should be reevaluated using an acceptable method of time study.
6. Assign Multi-Skilled Operators
Production Teams have increased flexibility, when work-content changes or gets stuck, because of multi-skilled operators.
It is possible that a critical operation may be behind schedule and it may be possible to have a trained operator from another process operating this in a temporary sense.
For instance, an operator experienced in both overlock and flatlock operations can be complementary to the operation requiring increase in capacity, if the former operation is capable of doing the job required for the same or greater production rate.
In order to do this, factories need to have an operator skill matrix, determine critical operations and offer cross training.
There is a need for the supervisor to ensure that moving an operator is not another bottle neck. Through the appropriate management of a multi-skilling, the waiting time is minimized, and the flow of production is ensured.
7. Introduce Performance-Based Incentives
If a fair incentive system can be established, operators can be motivated to increase productivity and reach the set production targets.
The factories can pay bonuses as individual and team, depending on the standards of quality maintained.
Clearly-defined targets, transparent rules and a balance between productivity and quality are crucial parts of an effective incentive!
This could also help to minimize avoidable overtime by boosting productivity while the traditional workday. Nevertheless, overtime may still happen due to the material delay, absence or urgency to shipments.
The ultimate aim is to increase productivity while simultaneously maintaining or enhancing product quality, safety and worker health.
8. Achieve Right-First-Time Quality
Right First Time (RFT) is by producing garments the first time with a minimum of half the repair/rework.
Rework requires extra manpower and machine time, decreases production capacity, and could cause delays with future processes.
For the sake of better quality of RFT, the factories should offer clear operating instructions, approved samples, proper training of operators, and machine setting training and assistance.
Quality issues need to be detected as soon as they occur. If a fault recurs, the team should try to find the underlying cause of the fault and take remedial measures.
It is generally more cost-effective to avoid defects than to fix clothes after they have been produced.
9. Reduce or Eliminate Non-Productive Time (NPT)
Non-Productive Time (NPT) refers to the lost working time, or time lost on production resources, when they cannot be used to create a product or service in order to make them unavailable for productive work due to delays or interruptions.
Common causes include:
Delays relating to awaiting cut panels or accessories.
- Machine breakdowns.
- Unbalanced workloads.
- Missing production materials.
- Unclear instructions.
There are some delays in making quality decisions.
For instance, if the fabric is not tied off to the next bundle, then there is less working time when the operator waits to tie the next bundle, but no extra garments are produced as a result.
The IE team should document each NPT; classify the causes of those NPTs and detect problems that seem to be recurring. These losses can be minimized through preventive maintenance, timely deliveries of materials, coordination and production monitoring on an hourly basis.
A reduction in NPT will enable factories to utilize the available working hours and enhance factory output.
10. Use a training system to build Operator Skills.
The skills of the operators are developed which enhances their productivity, quality and flexibility of production.
A trained operator might be able to perform an operation quicker and experience fewer defects, than a less experienced operator.
A highly practical training based on the requirement of operations, handling of machines, garment construction and quality standards should be offered in the factory.
Useful practices are: evaluating the operator skills, training workers before the introduction of new styles, creating multi-skilled operators for critical operations.
It is important for supervisors/IE teams to conduct training and review operator performance after training checking against the quality specifications and productive objectives.
Regular training can minimize learning time, provide consistency and aid to improve line efficiency.
How to Calculate Garment Line Efficiency
Production efficiency needs to be based on accurate facts, not assumptions.
The formula for the efficiency of the sewing-line is standard:
Line Efficiency (%) = (Total Output × Garment SMV) / Total Number of Operators/Working Minutes × 100.
Assume, for instance, that there is a sewing line that:
- Total operators: 30
- Garment SMV: 12 minutes
- Working time: 480 minutes
- Good output: 900 pieces
Earned minutes = 900 × 12 = 10,800
Available minutes = 30 × 480 = 14,400
Line efficiency = (10,800 ÷ 14,400) × 100 = 75%
This calculation is based on the assumption that output, SMV and working minutes are the same for each measurement.
Workers meeting should also track size of the product manufactured, rate of achieving the target size, occurrence of defects/rework, downtime, and overtime and understand what is causing efficiency loss.
Conclusion
A more effective way of doing garment production is by implementing good leadership, automation, appropriate line balancing, design of layout, multi-skilled operators, proper incentives, quality control, NPT reduction and continuous training.
Before production can be improved, Industrial Engineering personnel need to be able to look at where the losses are occurring in the production processes. Production data monitoring on a regular basis provides proof if these improvements are effective.
Consistently deploying the techniques, garment factories can boost productivity, manage production expenses and lower non-value added overtime, while delivering more predictable production performance.

Pingback: Garment Industrial Engineering || definination, roles, tools
Pingback: what is line balancing in the Garment Industry