Imagine a sewing floor about 11 am. Some operators are buried in the piles of cut parts and can not keep up. A few stations down are sitting around with nothing to do, waiting for work to come their way. Everybody is busy or trying to be, and yet the goal for the day is going down the drain.
Here’s a poorly balanced line. Most of the time, nobody’s work lazy and nobody’s work very slow. The work is just spread unevenly.
So let’s discuss line balancing. It sounds technical, but the idea is very simple
So, what is line balancing?
Sewing Line is a group of operators where working under one Production Supervisor. Each one of the garments are passes through that line, from one operation to another operation: attach the collar, join the shoulders, set the sleeves, and so on.
Line balancing means spreading the work evenly across all those operations so the garment flows smoothly from the first station to the last. This will entail pairing appropriate machines, manuals and helpers to each operation, depending on what type of product you are creating. Done work well, nobody’s drowning and nobody’s waiting.
There is a term for the problem that happens while the industry has the name bottleneck Every operation has its own output per hour, depending on how long the task takes (its standard minute value), how many people are on it, how skilled they are, and what the machine can handle. The lowest production run on the line determines the overall production. Whether it was one isides because of the other stations that could have done 170 per hour, didn’t matter. If one of the two stations only manages 90, then the line makes 90.
Consider a highway in which four lanes are squeeze into a single lane. The cars behind the squeeze pile up, and the road after it sits half empty. Same thing.
Objectives of Line Balancing
A balanced line will solve a lot of issues at the same time and quietly. Good balancing helps you:
- Keep material moving at a steady rate instead of in lumps
- Use your people and machines properly, with less idle time
- Achieved the daily target at the quality level that was promised
- Reduce time and costs to produce
- Work out how many machines and operators a new style really needs
- Familiarize operators with better distribution of work assignment.
- Compare machines required with those available.
- Eliminate errors in finished product, rushed, overloaded stations make more errors
And profit follows. If a line is steady, you will deliver on time with the agreed quality, for the planned cost. When it doesn’t, you pay for it in overtime, rework, and late shipments
The goal: match the pace of the line
The principle behind all of the above is to achieve an equality between the output of the station and the target rate or Takt time. You’re not aiming for all stations to be as quick as you can get them. Runners always tied with the front candidates just create a pile of work in process before the subsequent runner. All work stations should be running roughly at a more or less desirable running speed, at same or just above the sewing line’s requirements.
A simple example Line Balancing in the Garment Industry
Assume 120 pieces/hour as the production target and that there are seven operations in the line. Let’s take a look at what each one they are able to carry alone:
| Operation | Capacity (pcs/hr) |
| 1 | 170 |
| 2 | 120 |
| 3 | 125 |
| 4 | 130 |
| 5 | 90 |
| 6 | 150 |
| 7 | 100 |
Examine the operations 5 and 7. They can only do 90 and 100 pieces. Against a line output target of 120. When operating independently, the whole line would move along at 90 pieces/hour, although operation 1 can move 170 pieces/hour.
But, now who’s got spare space? Operation 1 has 50 pieces of additional capacity. Operation 6 has 30.
So we move some work around:
There are 40 pieces that are used in operation 1 to support operation 5. Operation 5 goes from 90 to 130, and operation 1 drops from 170 to 130.
Operation 6 provides 20 pieces for operation 7. Operation 7 goes from 100 to 120, and operation 6 drops from 150 to 130.
Now the line goes on to say:
| Operation | Before | After |
| 1 | 170 | 130 |
| 2 | 120 | 120 |
| 3 | 125 | 125 |
| 4 | 130 | 130 |
| 5 | 90 | 130 |
| 6 | 150 | 130 |
| 7 | 100 | 120 |
Every station is now at 120 or above. The line hits its target, and it didn’t need a single extra machine or operator. We just borrowed spare capacity from the stations that had too much and handed it to the ones that were short.
(In real life you’d also check that the operators who are helping have the right skills and machines for the task. Overlooking the machine on an operator is an indication that he or she cannot just “lend a hand” during a button attach project. However, the arguments are the same. )
How to find each station’s capacity
There is a quick approximation to this. Use the standard minute value (SMV) for the operation, which is the number of minutes it takes him to perform one piece, and divide 60 by that number. This is for one operator, one hour. Using the number of operators on the work station to multiply to determine the others operation capacity. Real efficiency will be less than 100% – take each operator’s skill level into account.
What to do next
If you’re running a line, or just learning how one works, try this on your next style:
- List every operation with its SMV.
- Work out each station’s hourly capacity.
- Find the lowest one. That’s your bottleneck.
- Look for stations with spare capacity and shift work toward the bottleneck, or add a helper or machine where it’s truly needed.
- Recheck after a day of running, because real output rarely matches the plan perfectly
Honestly, line balancing isn’t a one-time thing. Styles change, operators change, and a line that was perfect on Monday can drift by Thursday. The factories that do this well treat it as a habit, not a project.
A better line balance in garment industry increase productivity, increase efficiency, spreading the work evenly across all operator where nobody’s lazy and nobody’s very busy work.
Which is the idea anyway! Surface the slow spot, divide the load up and move things around.